Preliminary Alternatives Screening Report

Where We Are Now

Alternatives Recommended to Be Carried Forward

The Project Team is recommending these alternatives be carried forward for further analysis:

  • Alternative B
  • Alternative C
  • Alternative G
  • Alternative H

 

These alternatives represent a range of potential solutions including:

  • A range of termini on US 50 from Cole Lane to Versailles Options that range from entirely existing roadways (Alternative G) to entirely new alignment (Alternative B) Safety by reducing travel on roads with elevated crash rates Time savings of up to 13 minutes to destinations along US 50 Lower to modest costs

The project team considered dozens of factors when screening preliminary alternatives, including Draft Purpose and Need, Transportation Performance, Community and Environmental Impacts and Project Costs.

Downloadable Project Documents

Preliminary Alternatives Screening Report

Preliminary Alternatives Traffic Analysis Report

Preliminary Alternatives Moving Forward Map

Public Meeting Boards (PDF)

Overview Handout (English)

Overview Handout (Spanish)

Comment Form (English)

Comment Form (Spanish)